Our partners in Japan have successfully installed an GEPS system in Tokyo at Azabu High School. The school was constantly plagued by standing water and was the perfect location to demonstrate the power of GEPS.

Preparing the site for an GEPS installation

The project was completed by a team of well-trained installers on May 6, 2019; less than 1 month after installation, strong results have already been observed as water no longer accumulates on the field. We have demonstrated that GEPS can achieve strong results in urban environments, where traditional stormwater management techniques fail. We are proud to have contributed to a healthy playground for the kids at Azabu High School.

Installing a 12m GEPS at Azabu High School – Tokyo, Japan